An ERP that mirrors your operation, module by module
The operational core — orders, production, inventory, finance — built around your reality.
All Enterprise Platform EngineeringEnterprise resource planning is one system holding orders, production, stock, people and money in agreement. Template ERPs force a choice about how: bend your process to the template, or bend the template until it breaks. Either way the workarounds accumulate — offline spreadsheets, tribal knowledge, month-end reconciliation marathons. A custom ERP ends the bending.
- Month-end closing in days, not weeks
- Stock and ledger discrepancies surfacing in hours
- Zero per-seat license drag as headcount grows
What the work actually involves
Order-to-cash & procure-to-pay
Your commercial flows, exactly — pricing logic, credit rules, approval ladders and all.
Production & planning
Scheduling against real capacity, BOM and yield tracking, shop-floor data capture operators accept.
Inventory & stores
Multi-location stock truth with batch, serial, and expiry discipline where your industry demands it.
Finance & compliance layer
GST-ready documents, auto-reconciliation, and clean handoffs to your accounting system or CA.
Warehouse & despatch
Bin-level locations, putaway and picking rules, gate passes, and e-way bill generation at the volume a busy despatch bay actually runs.
HR, payroll & workforce
Attendance from the gate, shift rosters, statutory deductions, and a payroll run that reconciles to the ledger without a parallel sheet.
Quality & traceability
Inspection against your own specifications, non-conformance handling, and batch genealogy that answers an audit rather than a dashboard.
Maintenance & asset register
Preventive schedules against runtime rather than the calendar, breakdown history, and spares consumption tied back to stores.
Reporting & analytics layer
One reporting model over the operational data, so finance and operations argue about the decision rather than about whose number is right.
Phased module rollout
Strangler-pattern adoption: go live one module at a time while the old system retires gracefully.
What you are handed.
Yours to keep, and written so another team could pick them up.
A process map of how work actually happens
Built on your floor, not from a questionnaire. Yours to keep whether or not we build.
A domain model in your vocabulary
Heats, batches, yields — not Item, Transaction, Entity. Adoption follows the software agreeing with the floor.
Migrated data, reconciled
Including the nine years nobody has opened, with a reconciliation report you can sign off.
A cutover and rollback plan
Rehearsed before the weekend it runs, with the abort criteria agreed in advance.
The engagement
We do not publish prices — scope drives them. Everything else, here.
- Starts with
- Four weeks on site before a module is proposed
- Typical duration
- 5–8 months to first production release
- Who you get
- A delivery lead, three to six engineers, and an architect on the build
- Commercial model
- Discovery fixed, build phased against milestones
What the answer depends on.
Two sets of conditions. Read both against your own situation — most organisations recognise themselves in one column within a sentence or two.
This is the right call when
- A packaged ERP was tried and abandoned, or would force a process you cannot change.
- Finance or operations stops if the system stops.
- Someone senior will own adoption, not just the budget.
A different approach fits better when
- Your processes are standard and a packaged product would fit.
- You want it live in three months. Discovery alone is four weeks.
- The requirement is fixed and not open to challenge.
Where we have done this
Custom ERP for a steel processing group
Replaced five disconnected systems and a wall of spreadsheets with a single custom ERP — order-to-dispatch in one flow, month-end closing down from 9 days to 2.
9→2 daysMonth-end closing time
Admissions to alumni, one platform
One platform from enquiry to alumni across 6 campuses — admissions conversion up 19%, fee collections reconciled daily instead of monthly.
19%Higher admissions conversion
Questions about custom ERP solutions
Where this comes up most.
The regulatory context and the systems already in the building change the build. Each sector page says how.
More in Enterprise Platform Engineering
If this is close to what you need but not quite it, that gap is usually the useful part of a first call — discuss this capability.

